Case study
VIS opened its newest facility on schedule, with Integrity running the IT build.
VIS needed its new clinic and procedure center cabled, secured and equipped. Integrity worked with the general contractor from rough‑in to opening day.

Integrity was our day‑one IT partner in standing up our newest facility. They ran every cable, installed every workstation and secured the building, working with our general contractor and ensuring we opened on schedule.

- sq ft clinic and procedure center
10,000+
- cable drops, labeled and certified
150+
- facility opened on its planned date
On time
- uptime on hardware we installed
100%
At a glance
The short version.
Problem
A new 10,000+ sq ft clinic and procedure center needed every IT system built in, on the general contractor's schedule.
What we delivered
Structured cabling, the network closet, access control, video intercom and cameras, and every workstation and display.
Outcome
Opened on schedule. Nothing we installed has caused a problem since.
The challenge
A new facility on a fixed timeline.
6+
A full clinical build
Two ORs, 6+ ultrasound rooms and pre‑ and post‑op bays, each needing network, devices and security.
3
The GC's schedule
Cabling had to go in during rough‑in, terminations after drywall, and devices last.
1
One opening date
The date was set, so every room had to be connected and working before the first patient.
What we delivered
The whole IT build, one partner.
Structured cabling
150+
drops across the facility
Before
Open walls and ceilings, and a short window before drywall.
After
Cat6A to every room on J‑hooks, firestopped through rated walls, then labeled and certified.
Network closet
100%
uptime on installed hardware since opening
Before
An empty closet and no place for the network to land.
After
Rack, patch panels and cable management installed. Firewall, servers and UPS racked, patched and brought online for VIS's MSP.
Security and access
3
systems: access control, intercom and cameras
Before
No door access, entry intercom or cameras.
After
Card readers coordinated with the door hardware, a video intercom at the entrance and IP cameras recording to an NVR.
Workstations and AV
Every room
equipped and tested
Before
Rooms with power and data, but no devices.
After
Workstations, monitors and peripherals installed. Displays procured and wall‑mounted.
How we worked
On the GC's schedule, start to finish.
Planned with the GC
Drop locations and the network closet mapped to the plans and scheduled into the build.
Rough‑in
Cat6A pulled before the walls closed, with firestopping at rated walls.
Trim‑out
After drywall: jacks and patch panels punched down, faceplates set, every drop tested.
Security and devices
Access control, intercom and cameras, then workstations and displays, before opening day.